Log in
Latest topics
Top posting users this month
No user |
Broadcasting Duo Facebook Page
Current date/time is Tue 07 May 2024, 12:42 pm
Search found 85 matches for pictures
Train sets!
1mtvfan wrote:cut me a little slack, you guys all love this thread to death, so it's easy for me to forget about the 24 hour separation thing. but that's taken us off topic, getting back on topic, here's some new pics.
- Spoiler:
[Only mods are allowed to see this link]
Fences installed on Drop Bridge no. 3
- Spoiler:
[Only mods are allowed to see this link]
fence installed on level2 near the level 2 town station area
just have to add more fences to the rest of level 2 as well as the landscaping and safety nets.
1mtvfan wrote:landscaping will begin soon, if only in parts, also looking at adding some kill switches in.
I dont love this thread to death, I just think it is nice to see how much work and love you put ito your [Only mods are allowed to see this link] is all. Thanks for sharing these [Only mods are allowed to see this link] of the [Only mods are allowed to see this link] of your train set.
Dont forget about using hashtags as well guys .
- on Mon 11 Apr 2016, 6:41 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:new pic is in
- Spoiler:
[Only mods are allowed to see this link]
former SF Kodachrome Sd40-2 no.5068 leading the way with a short consist across the level 2 drop bridge
1mtvfan wrote:DCC installation is progressing, but i have added a kill switch to the list of projects after suffering a very serious accident during my time on the LVCRR earlier today, but I've a feeling it will not be added until after the DCC is fully installed, if the kill switch is installed at all.
so it may be such that i will have to sit out and wait again, also, fences are
being added to the upper level, finally, after several more cases of equipment derailing and
falling to the floor.
1mtvfan wrote:new pics are in.
- Spoiler:
[Only mods are allowed to see this link]
Coors beer reefer at the freight station
- Spoiler:
[Only mods are allowed to see this link]
potential location of some tunnels, single track tunnel is for a road, as it's not usable for the rails,
will have to find a way to hide the visible wires
1mtvfan wrote:new pics are here
- Spoiler:
[Only mods are allowed to see this link]
fences installed on first drop bridge
- Spoiler:
[Only mods are allowed to see this link]
fences on second drop bridge.
plan is to add these fences on all of the 2nd level
1mtvfan wrote:fences are in place on drop bridge No.3, but drop bridge nos. 2 and 3 are seldom used, as it means a reduced level of accessibility to areas of the layout when they're used, still have to add the fences to the rest of level 2.
Thanks for the updates on the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and [Only mods are allowed to see this link] as well as for the [Only mods are allowed to see this link].
P.s So much for 24 hour post seperation . Perhaps we should just get rid of the edit button altogether, as it seems to be rarely used ...!
- on Fri 08 Apr 2016, 10:43 pm
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:well, it's just going to add more ability to control multiple units at one time and more bells and whistles, but i can say that i have my CP rail Expo unit no 6057 working again, just have to let it cool down as it was run pretty hot after it was given a maintenance service. and it also means that one of the locos in the front line
of my current train can get a break now.
TigerTankFan wrote:Unfortunately there are only 2 units that are DCC ready at the moment, so it will take both time & money to get the rest of the fleet modified for this control system. There are some units that will not be converted though, since they aren't worth the effort.
1mtvfan wrote:what are you talking about? there's 3 locomotives ready for DCC communicability in our rosters. well, technically 4, but one has to be repaired.
1mtvfan wrote:Update,
former CP Rail SD40-2 no. 6057 performed flawlessly on it's maiden run after returning to the LVCRR from its long hiatus, those maintenance guys really know their stuff about servicing to make a locomotive perform, just some slight noise has resulted, but it's acceptable, now it is the former BNSF
SD40-2 no.7835's turn to be given service next, and after that is former Soo line no.772.
pics follow in next post, or will be added to this post if so desired by the head admin.
1mtvfan wrote:pics are in.
[Only mods are allowed to see this link]
Former CP rail Sd40-2 no.6057 tied into a consist on it's first day back from its maintenance service
[Only mods are allowed to see this link]
former CN rail Sw1500 No.1571 Descending the 2nd level
[Only mods are allowed to see this link]
a much better shot of 1571 descending the 2nd level
[Only mods are allowed to see this link]
Former CP rail SD40-2's No's 5415, 6057, former Conrail SD40-2 no. 5537 and former SOO line GP38-2 no.4506 sitting at a red signal with their consist of mixed freight
Don't forget about the 24 hour seperation thing mtvfan, try to have posts be seperates by 24 hours if at all possible .
Anyway, nice [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and thanks for the update on [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] .
- on Tue 05 Apr 2016, 12:13 pm
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:just have to find a way of controlling both lines on both the DCC and the Analog, or non DCC systems. also preparing the floor for more paint, as the time of year has brought about some flooding in the areas under the layout and that must be addressed before anything is done. but sites for installation of the DCC boxes are being considered. pictures follow
[Only mods are allowed to see this link]
possible site 1
[Only mods are allowed to see this link]
possible site 2, white box is part of the DCC system
keep in mind though there is the main power unit and the wireless signal
receiver unit. to install, and inside line, the east line, is working again,
seems i burned out the selector again
TigerTankFan wrote:there has also been some discussion about applying a sealant to the walls and floor of the basement where the setup is located, but there has been no action on this matter as of yet.
1mtvfan wrote:that will be happening after Easter, as well as obtaining a new selector switch to run both the DCC and the Analog system, i will also be trying to obtain some new flatcars for the last scrap hopper load and the construction roller, and an empty one for a spare, but not all of them at once, as that would be too much to pay for in one go
1mtvfan wrote:new flat car on the roster now, as well as a connector switch for the DCC system,looking very good for running both Analog and DCC, just have to decide if i want to use the new flat car for the Scrapped CN hopper or for the road roller,. still have to paint the floor and seal the leaky spots
1mtvfan wrote:went with the scrapped hopper on the new flat car so the road roller has to wait for a bit longer pictures follow.
[Only mods are allowed to see this link]
Former Soo Line flat# 5033 loaded with a scrap quad hopper
[Only mods are allowed to see this link]
five 60' bulkheads and one 50' bulkhead sitting and waiting for pickup, as a short string of boxcars and mixed freight rolls past
[Only mods are allowed to see this link]
Former CN SW1500 no. 1571 Working at shunting duty
1mtvfan wrote:update, DCC control boxes are going in site 2, just forward of container yard 2, pictures follow.
[Only mods are allowed to see this link]
[Only mods are allowed to see this link]
some pics of the box made for the DCC control boxes, main throttle box will sit in the tray. and wireless receiver will be anchored to that tray in some form
1mtvfan wrote:update, DCC work has stalled, due to loop issues
Thanks guys for the continous updates and [Only mods are allowed to see this link] on the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] .
Glad to hear your still working to add that [Only mods are allowed to see this link] to your train set . I bet it will make your train set look really cool once added.
- on Sat 02 Apr 2016, 11:49 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:yes indeed, upper loop is in the process of being powered also, as is adding a fence to the upper part of phases 2 and 3, or will add some safety nets along with the landscaping, as well as some tunnel portals to the right places so it will look quite nice when it is finally done. an new pic follows
- Spoiler:
[Only mods are allowed to see this link]
former Canadian Pacific rail 50 foot gondola no. 340203 and former life like shows 4 foot flatcar no. 126554, fresh form renumbering, and both carrying wheel loads, sitting at the freight station.
1mtvfan wrote:also working on the home made draw-bars too
1mtvfan wrote:one more home made draw bar in place, and holding so far, couple more to make as spares. not to mention testing them
Thanks for these updates and [Only mods are allowed to see this link] on the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and [Only mods are allowed to see this link] .
- on Wed 09 Mar 2016, 9:27 pm
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:that's one whole train on the helix mind you
1mtvfan wrote:upper reverse loop is under construction, as is drop bridge no. 3, will be adding more to the process
in the next few weeks. picture follows
- Spoiler:
[Only mods are allowed to see this link]
Newly added support for upper reverse loop and drop bridge no. 3
1mtvfan wrote:upper reverse loop has been mocked up, after height has been added to allow
double stacks to clear. but it has been discovered that the added height
means a very steep grade on the one side of the 3rd drop bridge, so the upper loop is
going to be entered from the long way around, also, the helix
fence does not allow my go pro camera case to clear going up,
but going down is perfectly fine for it, i will also see what my tablet can do with it as well, so
either way, you will get to ride the helix up, and down with the trains. lastly, i am working on adding a number to one of my unnumbered flatcars that i just got working right.
1mtvfan wrote:update, upper reverse loop bench work is complete, and drop bridge no. 3 is in place, no pics of new drop bridge deck yet, but i will add the pics of the new upper loop bench work when i can for you all, my go pro camera case just scrapes the bottom of the upper loop bench work, but it is enough to impede the motion of it on the ramp of the helix, but i will be trying to come up with a way of showing it to to you all in a video, even if i means a static camera view. picture follows.
- Spoiler:
[Only mods are allowed to see this link]
last part of upper reverse loop in place, waiting for track bed, tracks, and power. pic of Drop Bridge no.3 will be added later
1mtvfan wrote:new pics are in, should have added one the other day, but was busy and forgot.
- Spoiler:
[Only mods are allowed to see this link]
Newest drop bridge secured in the"down" position
- Spoiler:
[Only mods are allowed to see this link]
newest drop bridge with track bed installed, waiting for tracks and power. hope you guys don't need to see it when it's up and working, because it's the same as the other 2 that way.
also working on another protective case for my go pro camera, one that will fit under the bench work of the upper reverse loop, as i don't want to damage the camera's lens. and also
very bummed i broke 4 of my draw-bars, and i know they're almost impossible to
find that kind of draw-bar now. and A draw bar is how i keep my container well cars, the long and low
ones, together, i was able to repair a pair of them with some model glue, but there's no telling how long the glue will hold, so i will have to look for new ones as close as i can get to the ones that broke, or make some workable ones
Thanks for sharing these [Only mods are allowed to see this link] or your [Only mods are allowed to see this link] .
- on Thu 03 Mar 2016, 8:54 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:well, you guys have seen pretty much everything there is to date, but i'll still do what i can for you all
1mtvfan wrote:new pics are in from last night's running session
- Spoiler:
[Only mods are allowed to see this link]
SD40-2's no. 5415, no. 772, and 5537, descending the newly built
helix with a long mixed freight.
- Spoiler:
[Only mods are allowed to see this link]
same SD40-2's crossing under their same train on the helix
- Spoiler:
[Only mods are allowed to see this link]
newly loaded bulkhead flatcar, except this one is a 50' instead of my normal 60' ones
Thanks for sharing these [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and new [Only mods are allowed to see this link].
- on Thu 25 Feb 2016, 4:38 pm
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:now just have to wire up the helix for some electrical power and test it, as well as raise the upper loop bench work to allow the clearance for double stacks
1mtvfan wrote:only until a new piece of equipment comes into the mix
1mtvfan wrote:helix will be wired for power, and tested tonight, will try and take pics of it for you all
1mtvfan wrote:helix is working, save for a few teething and minor electrical issues
1mtvfan wrote:[Only mods are allowed to see this link]
Fully completed Helix, the white line on the back and outside edge is a "fence" to keep equipment from falling off and breaking.
[Only mods are allowed to see this link]
fully completed yard for phase 3 , showing the yet to be completed upper reverse loop, which is going
to be raised up 1/4 inch to allow the double stacks to clear the bottom of the bench work.
yard is only a quarter full, as both TTFan and i have much more equipment than can fit in the
yard at any one time. And the oblong bits at the ends of some tracks are chunks of wood serving for
temporary bumpers until some proper ones can be added, but some wheel stops may be used in place of standard bumpers.
also planning another spur off of the loop for the big boy locomotive to rest on instead of its current location.
Thanks for the updates on the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] as well as the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] .
Don't forget to keep using hashtags whenever possible.
- on Sat 20 Feb 2016, 9:54 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:newest plan is to raise the reverse loop bench work a few inches to allow more clearance for the double stacks to pass underneath, as the helix ramp is not coming down as fast as liked.
- Spoiler:
[Only mods are allowed to see this link]
most recent progress of the helix ramp, will get a more updated photo of it tonight
1mtvfan wrote:helix bench work is complete, adding track bed and track now, but may have to re lay it because of rough and high spots. pictures follow.
- Spoiler:
[Only mods are allowed to see this link]
old [spoiler] showing the helix near completion
- Spoiler:
[Only mods are allowed to see this link]
helix showing bench work complete, and in the process of receiving track bed and tracks.
Flat track alongside is for the lower reverse loop
Thanks for sharing these nice [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] . The [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and [Only mods are allowed to see this link] seems to be coming along good.
- on Sat 13 Feb 2016, 11:36 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:new yard spurs are in place, and being put to use, pics will be posted tomorrow, just have to work out the bugs on electrical for the upper reverse loop and helix, as well as iron out the issues with the lower loop and passenger coaches. but will add this pic for you all
- Spoiler:
[Only mods are allowed to see this link]
another head in the vice for this one
1mtvfan wrote:
- Spoiler:
[Only mods are allowed to see this link]
old picture, but shows the new yard spurs going in.
- Spoiler:
[Only mods are allowed to see this link]
containers west and a mixed freight east
- Spoiler:
[Only mods are allowed to see this link]
new yard spurs put to use
Thanks for sharing these [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] 1mtvfan .
- on Sun 07 Feb 2016, 1:48 pm
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:the helix and reverse loop is part of the train set, pictures follow
[Only mods are allowed to see this link]
Current progress of the upper reverse loop
[Only mods are allowed to see this link]
current progress of the helix, but in testing phase
also, more yard tracks have been added, will get a more recent picture for you all later, as well as
slightly raising the loop section over the incline of the helix
Thanks for sharing these [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and of the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and [Only mods are allowed to see this link] .
- on Wed 03 Feb 2016, 7:21 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:well it's been with us since our dad had it back when he was a kid, and it was going to burn out at some point, that sort of thing can only handle so much for so long, and it was 50 years old when it was installed 3 years ago, so once it goes, all that can be done is replace it.
1mtvfan wrote:update, electrical issues continue, but the new controller and selector boxes are in place. the controller box however is only there because it is not compatible with the one that burned out. so that is now ruled out, all that is left to do is to rewire the power area from scratch with new wires and it is hoped that this will solve the problem, and get the construction of part 2 phase 3 back on the priorities list.
1mtvfan wrote:electrical issues are resolved, building part 2 of phase 3 is back on the top of the priorities list, followed by drop bridge No 3, it would be a lot better if TTfan came by the LVCRR, but things are what they are at this point, and it cannot nor will it be forced on him, also, my Tablet sadly will not fit under the upper phase 2 bench work standing up, and will not pass by the supports when turned sideways without snagging, so there is nothing i can do about that right now, but i will keep trying to see what works best, but since there isn't much to see on that part of the layout i don't think it needs to be seen anyway. still more, a new [Only mods are allowed to see this link] follows
- Spoiler:
[Only mods are allowed to see this link]
former CP Rail bay window caboose no. 437265 sits on the freight station storage spur while a freight train rumbles past
1mtvfan wrote:even though i'm leaving on an LOA today, here's the newest [Only mods are allowed to see this link] from the LVCRR
- Spoiler:
[Only mods are allowed to see this link]
Former CP rail Wide vision caboose No. 434716 taking a turn on the freight station storage spur
- Spoiler:
[Only mods are allowed to see this link]
new Selector and controller boxes in place and Wired up
- Spoiler:
[Only mods are allowed to see this link]
Old controller and Selector boxes
- Spoiler:
[Only mods are allowed to see this link]
part 2 of phase 3 with new rails added from the drop bridge back
- Spoiler:
[Only mods are allowed to see this link]
newest cold container stacked for running on the stack train.
Track laying continues for the parts that have roadbed in place, and more bench work to complete
as well as adding more to the helix and upper reverse loop, building the 3rd drop bridge, roadbed and track laying and then the electrical to complete as well, but things are progressing.
Thanks for sharing these [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] . Glad to see the electrical issues have been fixed and your train set is running once more.
You were able to upload pictures using the on site uploader without any issuee? I only ask because there is apparently supposed to be some techinial issue with serverside that is supposed to make it impossible to upload images via the on site editor. It seems, however, that maybe the issues are not effectng BD?
Anyway, enjoy your vacation from BD 1mtvfan and we will see you in 2 weeks. Don't worry, the rest of us staff will hold down the fort while your away.
- on Tue 12 Jan 2016, 11:18 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:we should, but it's going to take a while as there's a jungle of wires to sort through
1mtvfan wrote:update,
power issue has been solved, but now another issue for the inside rail has come up, that one however will be solved later tonight, also a new [Only mods are allowed to see this link] follow.
- Spoiler:
[Only mods are allowed to see this link]
ex CP rail 0-6-0 saddle tank no. 55 newly arrived to the LVCRR
- Spoiler:
[Only mods are allowed to see this link]
old bridge sitting discarded,unused, and abandoned in the process of being stripped for track bed and rails
1mtvfan wrote:update,
electrical issues continue, looks like a controller block has burned out on one side, so that is the reason for the inside track ceasing function, so all we can do is sit it out and wait for a new controller block to arrive for replacement.
1mtvfan wrote:further update,
the inside track power issue will be solved tonight, and a 3rd control box will be added for the phase 3 sections, which means they will not have to be added later.
1mtvfan wrote:the problem has already been mentioned, it is the one side of the Selector control box, but this was bound to happen as the 2 independent lines were wired into this 50 year old selector box, so it was only a matter of time before it burned out, it is a wonder the whole box didn't burn out completely, but it is also a wonder it didn't burn out when it was first installed over 3 years ago.
That is cool, glad you guys found the issue. That sounds like a really good selector box if it worked over 50 years .
Thanks for the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link].
- on Fri 08 Jan 2016, 8:05 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:new [Only mods are allowed to see this link] are in
- Spoiler:
[Only mods are allowed to see this link]
Drop bridge no. 2 down and with roadbeds in place
- Spoiler:
[Only mods are allowed to see this link]
Drop bridge no.2 up, roadbeds still in place
- Spoiler:
[Only mods are allowed to see this link]
lead in to the upper loop and helix, with partial roadbeds in place.
now what's left is finishing helix risers, more bench work to support the last half of the upper
reverse loop, a 3rd drop bridge, securing more roadbed, laying track and wiring in the power supply,
as well as wire in a jumper wire to the double crossover switch on the 2nd level to get some power past a certain point.
1mtvfan wrote:new [Only mods are allowed to see this link] are in now.
- Spoiler:
[Only mods are allowed to see this link]
one view of the jumper wires on the double cross over switch
- Spoiler:
[Only mods are allowed to see this link]
2nd view
- Spoiler:
[Only mods are allowed to see this link]
Current progress on the helix
now all that is left is to complete the helix, add more bench work for the upper reverse loop, add a 3rd drop bridge to the upper reverse loop as well as roadbed and tracks, as well as figure out why the outer throttle is not powering the upper level. so the progress is going very well.
Thanks for sharing these [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] . Seems like good [Only mods are allowed to see this link] is being made on your [Only mods are allowed to see this link].
- on Tue 05 Jan 2016, 8:54 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:It was mentioned in a previous post by TTfan, but i think the footbridge is only a proposition. also, 2 new [Only mods are allowed to see this link] follow
- Spoiler:
[Only mods are allowed to see this link]
Newest steam loco on the LVCRR resting on one of the turntable spurs
- Spoiler:
[Only mods are allowed to see this link]
Newest cold can waiting for its turn on the container train
Oh, ok then!
Thanks for sharing these [Only mods are allowed to see this link] of the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] as well as your [Only mods are allowed to see this link] and [Only mods are allowed to see this link] .
- on Tue 29 Dec 2015, 1:48 pm
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:it's really amazing how a fraction of an inch can throw everything off, it really is, because the case of my gopro has a tab on the bottom which allows it to slide and secure into mounts, which i will have to show you all so you know what i am talking about, but i can't add the mount onto the depressed center flat car because it will make the COG too high and the car will tip over, but i will do what i can to bring you all with me on the helix, but the loop is pretty self explanatory. [Only mods are allowed to see this link] follow in second post
- Spoiler:
- 1mtvfan wrote:[Only mods are allowed to see this link]
one more part added to the [Only mods are allowed to see this link] in the testing phase, yet to be secured- Spoiler:
- [Only mods are allowed to see this link]
2nd [Only mods are allowed to see this link] with the hardware in place to hold it up.- Spoiler:
- [Only mods are allowed to see this link]
2 model shipping containers, a 48'(scale feet) stacked on a 53'(also scale feet) container- Spoiler:
- [Only mods are allowed to see this link]
four 20' (again scale feet) containers on my 89' (scale feet) flatcar
and i say scale feet because all of these are miniature versions of their real life counterparts,
and they are made from the blueprints used to build the real life versions
Thanks for sharing these [Only mods are allowed to see this link] .1mtvfan wrote:new [Only mods are allowed to see this link] are in, and apologize for the delay- Spoiler:
- [Only mods are allowed to see this link]
Helix progress so far- Spoiler:
- [Only mods are allowed to see this link]
one view of the tablet stand i built- Spoiler:
- [Only mods are allowed to see this link]
another view of the Tablet stand i built, for the day i start live streaming.
Thanks again for sharing!1mtvfan wrote:foot bridge? what foot bridge?
I don't think anyone mentioned anything about a foot bridge?
P.s Guys if you any trouble uploading images today and possibly tommorow, its due to a tech problem FM currently is experiencing .
- on Tue 29 Dec 2015, 12:07 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:down slope of the [Only mods are allowed to see this link] has begun, loop pieces are being secured and new [Only mods are allowed to see this link] securing hardware has yet to be installed. [Only mods are allowed to see this link] follow.
[Only mods are allowed to see this link]
Down slope of the helix just starting
[Only mods are allowed to see this link]
upper reversing loop starting also, tabs sticking out are supports
[Only mods are allowed to see this link]
helix part 4 in its preliminary place, yet to be secured
although the helix may be built in parts
Cool [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and on the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and [Only mods are allowed to see this link] .
- on Sun 20 Dec 2015, 11:05 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:everyone on here gets a kick out of the setup, so we keep posting on this thread
1mtvfan wrote:new [Only mods are allowed to see this link] are in
- Spoiler:
[Only mods are allowed to see this link]
upper reverse loop and helix parts in preliminary place, inside curve is going to be the upper
loop, outside curve is to be the helix
- Spoiler:
[Only mods are allowed to see this link]
New drop bridge in primary place in the "down" position
- Spoiler:
[Only mods are allowed to see this link]
new drop bridge in the "up" position, me holding it up because it hasn't got anyway to secure it up yet
Thanks for sharing those [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and [Only mods are allowed to see this link].
- on Sat 19 Dec 2015, 9:28 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:construction has started again, so all other issues are either irrelevant or are just too petty and immature to be mentioned, but as of now, the inline for the upper loop and helix is in
place, but there is still more work to do. [Only mods are allowed to see this link] will show you the progress so far
- Spoiler:
[Only mods are allowed to see this link]
newest incline looking down from drop bridge area.
- Spoiler:
[Only mods are allowed to see this link]
newest incline, looking down from west.
1mtvfan wrote:new [Only mods are allowed to see this link] are in
- Spoiler:
[Only mods are allowed to see this link]
supports for the upper reverse loop of phase 3, using metal rod in place of the beefy wooden supports because the wood supports would interfere with the train operation
- Spoiler:
[Only mods are allowed to see this link]
traditional wood support for the remainder of the line before the new drop bridge goes in.
- Spoiler:
[Only mods are allowed to see this link]
last piece of line before the new drop bridge in place before being secured.
- Spoiler:
[Only mods are allowed to see this link]
supports and last piece of line before the new drop bridge secured in place.
what's left to do is the new drop bridge, and the line beyond that, as well as the helix and the reverse loop which will tie back into the upper line somehow, but that has yet to be worked out.
Thanks for posting these [Only mods are allowed to see this link] of your [Only mods are allowed to see this link].
- on Mon 14 Dec 2015, 11:11 pm
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:i am still working on some new loads too, but they are on hold at the moment
TigerTankFan wrote:I forgot to mention this earlier, but one of my standard flatcars now has a new tie-down now and it looks awesome.
1mtvfan wrote:yes, it does look very good, i just regret not taking a picture of it the last time i was there
1mtvfan wrote:new [Only mods are allowed to see this link] are in
- Spoiler:
[Only mods are allowed to see this link]
EX CPRAIL SD40-2 5415, EX Conrail SD40-2 5372, and EX Soo line SD40-2 772 pulling a mixed
freight through the phase 2 underpass
- Spoiler:
[Only mods are allowed to see this link]
Tail end of same mixed freight
- Spoiler:
[Only mods are allowed to see this link]
more pipes for the bulkhead flat to carry
- Spoiler:
[Only mods are allowed to see this link]
another view of the pipes on the bulkhead
- Spoiler:
[Only mods are allowed to see this link]
Grain hoppers parked on the yet to be completed lower reverse loop of phase 3
also, the next part of level 2, leading into the upper reverse loop and helix is being raised up a
1/4 inch or so for better clearances.
1mtvfan wrote:update, the reverse loops and helix on phase 3 are on hold yet again, which is proving very taxing
and annoying, so i have made it clear that I will be sitting
it out until construction starts up again, but now the question becomes
how to pass my time now that i am not running trains around
Thanks guys for keeping us updated on the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] and on the status of your [Only mods are allowed to see this link] and [Only mods are allowed to see this link]. Thanks also for sharing those [Only mods are allowed to see this link].
- on Sat 12 Dec 2015, 9:56 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:update, cradle for TT fan is complete, and it looks really good, now the plan for the wheel cradle is in motion, but the one snag is that the sprues do not fit through the center of the wheel rims so they will have to be laid flat on the rig, then secured to the rig in some way, either cradled in or tied down. Lastly, 7835 has suffered yet another breakdown, and this one may not be fixable by me, but i have 3 other locomotives that work fine so i am not worried much about it, but if i can, i willt ry and see about some repairs, if theya re possible, picture of new cradle follows tomorrow, or Wednesday at
the earliest.
1mtvfan wrote:no new pics of the pipe cradle i built for TTFan yet, but will try for tomorrow, but the rig for the Technic Lego wheels has been constructed, i just have to find a way to secure the remaining 2 wheels to the rig itself, will add a pic tomorrow also if i can. as well as some pics of the new loads i have just made and am in the process of making
1mtvfan wrote:new [Only mods are allowed to see this link] are here
- Spoiler:
[Only mods are allowed to see this link]
3 loads at the freight station waiting for loading
- Spoiler:
[Only mods are allowed to see this link]
3 Lego Technic wheels on rims on the wheel rig built for them.
the sprues are from the Grain elevator kit and were just sitting around collecting dust, and the
pipes and wheels were giving me trouble for a long time, so i decided to try and rig something
together for them, and used those sprues to do it, i am happy they turned out as well as they have.
Cool thanks for the updates and [Only mods are allowed to see this link] on the [Only mods are allowed to see this link] of your [Only mods are allowed to see this link] .
- on Fri 27 Nov 2015, 12:56 pm
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
TigerTankFan wrote:The plan for new tie-downs being used on the flatcars I own has been approved now, but an acute lack of them is keeping me from implementing this plan.
1mtvfan wrote:well, i still have to come up with something for those wheels, but that's for next week at some point,
but they will be secured flat instead of standing upright, unless they do not clear the tight clearances of the phase 2 area, so that will be tested next week also
1mtvfan wrote:Update, new [Only mods are allowed to see this link] are here
[Only mods are allowed to see this link]
length of brass pipe resting in its custom made cradle on the bulkhead flatcar that was being troublesome
[Only mods are allowed to see this link]
another load of pipe at the freight station ready to go.
Thanks for the updates and for sharing those [Only mods are allowed to see this link] of your [Only mods are allowed to see this link].
Try and remmeber that all posts need to be seperated by 24 hours, if there is any new changes, updates or anything you need to add before then, use the edit button .
- on Sun 22 Nov 2015, 11:31 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:it is as fixed as it is going to get, but i did buy another the other evening.
update, still working on the weathered Bulkhead load, as i was there today, but will keep trying
Further update: am getting closer on getting a load secured to the weathered bulkhead flat,
just need more time, and supplies, but i can get the supplies relatively easy, and apologize for not taking any new pics for you guys, i forgot to take my tablet with me when i went there earlier tonight.
TigerTankFan wrote:Some news from me here, one of my flatcars has the early stages of new tie-downs installed (since the railroad's board of directors felt a need to replace them). I hope to add a photo to prove this asap.
1mtvfan wrote:the owner of the flat car has yet to inspect and improve the new tie downs however
Update: the bulkhead load has still been giving me trouble, but i am continuing to work on a
solution, but i am thinking of making some sort of special cradle for it or coming up with a new type
of load for this bulkhead flat car. Further update: i will be trying something new, as i have an idea of
what i can do to help secure the load to the flat car.
Thanks Tigertankfan and 1mtvfan for those wonderful updates and [Only mods are allowed to see this link] on your [Only mods are allowed to see this link] , it looks to be making good [Only mods are allowed to see this link] and coming along great!
- on Sat 21 Nov 2015, 10:56 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:the tie downs are just in phase 1 atm, the next phase will have wire S hooks , so it is not so hard to secure them to the bulkhead. [Only mods are allowed to see this link] will show you
- Spoiler:
[Only mods are allowed to see this link]
tie down chains in the process of being tied down
- Spoiler:
[Only mods are allowed to see this link]
tie down chains in the completed state
update, tie down plan for bulkhead flat no 2 has suffered a minor setback, as part of the
flat car have broken because of too high a pressure load being placed on them, so a new
plan has to be devised to carry the wheels as the current ones on are secured,
but not secured enough to keep them from wobbling around a great deal too much
Thanks for sharing these nice new [Only mods are allowed to see this link] .
TigerTankFan wrote:Unfortunately there's nothing new on my end, as I haven't visited the setup in a little while now plus I'm occupied with some other priorities at present.
1mtvfan wrote:further update, the wheels are coming off bulkhead no 2 and being set aside for now, bulkhead no 2 will now carry more pipes, this will remain for this bulkhead until i can find another place for the wheels or another flatcar for them. and by wheels i mean the wheels i was using for a load, not the wheels on which the flat car runs.
Thanks for the updates on your [Only mods are allowed to see this link] guys . Hope all is fixed soon!
- on Mon 16 Nov 2015, 7:19 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Train sets!
1mtvfan wrote:new [Only mods are allowed to see this link] are here
- Spoiler:
[Only mods are allowed to see this link]
60 foot bulkhead flatcar with a load of pipes made of Slurpee straws
- Spoiler:
[Only mods are allowed to see this link]
A trio of SD40-2's, former CPR 5414, Conrail 5372, and SOO 772 pulling a long merchandiser eastbound past the liptonville station
- Spoiler:
[Only mods are allowed to see this link]
former BSNF SD40-2 7835 resting after passing its evaluation tests for the day
Nice [Only mods are allowed to see this link] of your [Only mods are allowed to see this link]! Thanks for sharing and for using [Only mods are allowed to see this link] .
- on Tue 10 Nov 2015, 7:11 am
- Search in: The Dump
- Topic: Train sets!
- Replies: 990
- Views: 45482
Page 2 of 4 • 1, 2, 3, 4
Wed 27 Mar 2024, 7:33 pm by TigerTankFan
» lake trip pics?
Wed 27 Mar 2024, 7:32 pm by TigerTankFan
» Praise FM
Thu 07 Mar 2024, 11:21 pm by TigerTankFan
» Camup General Discussion
Thu 07 Mar 2024, 11:18 pm by TigerTankFan
» Logitech C920 Pro Webcam
Thu 07 Mar 2024, 11:12 pm by TigerTankFan
» AForum :: Advertising Forum
Thu 29 Feb 2024, 1:19 am by Sir Chivas
» Daily Chit Chat
Tue 06 Feb 2024, 1:58 am by DJAaronRadio
» Numbers in Pictures
Wed 17 Jan 2024, 12:22 pm by Brandon
» Name a city that doesn't have the letter A in it
Wed 17 Jan 2024, 12:12 pm by Brandon